色屁屁影视大全-色琪琪av中文字幕一区二区-色琪琪丁香婷婷综合久久-色琪琪久久草在线视频-色琪琪久久综合-色琪琪原网站亚洲香蕉

Welcome to the official website of Shenzhen Taiyou Electronic Technology Co., Ltd!

Shenzhen Taiyou Electronic Technology Co., Ltd

20年專注于立式注塑機(jī)的生產(chǎn)與制造

24小時全國服務(wù)熱線:0755-33855605

Shenzhen Taiyou Electronic Technology Co., Ltd

Address: No.2, North 1st Road, Tianyang Third Road, datianyang Industrial Zone, Songgang town, Bao'an District, Shenzhen
Telephone:0755-33855605
Fax:0755-33855606
E-mail:twtaiyou@163.com
Website:http://www.switched.cn

當(dāng)前位置:首 頁 ? News ? Industry trends

Operation elements of vertical injection molding machine

文章出處:臺佑電子 | 作者:臺佑電子 | 發(fā)表時間:2020-07-07

In the plastics processing industry, Shenzhen Taiyou Vertical Injection Molding Machine is a kind of expensive injection molding equipment. The output of vertical injection molding products accounts for more than 30% of the total amount of plastic products. It has the characteristics of high production automation, short production cycle, strong adaptability and high production capacity. Except for fluoroplastics, almost all thermoplastics can be molded by this equipment. Relay) contactor control system is usually used for mold clamping, injection, holding pressure and mold opening of the original injection molding machine. The wiring of detection elements is chaotic, the reliability is poor, and the integration is low. In order to improve the function of the injection molding machine and improve the reliability of its production process.


The operation process of vertical injection molding machine can be roughly divided into: preheating, mold clamping, injection, calendering and holding, mold opening, top punching, flash evaporation and other processes. These processes are batch production processes, and each process can be controlled according to changes in time or direction. At different times or directions, the device's travel switch or proximity switch advocates the timer of the central processor to start timing. If the motion mechanism reaches the end point or the specified orientation within the specified time, the corresponding travel switch or proximity switch will be triggered, the system will consider that the execution of the action has ended at this time, otherwise it will stop the machine and issue a defect alarm. Because the vertical injection molding machine has many movements, some movements require skills, so multiple orientation control points must be set to switch parameters. In the process of time care, one after another is advocated, distinguishing the actions at the time, and after admitting that they are correct, opening or closing the corresponding implementing agencies and ending the routine actions. The entire production process has gone through seven processes, so this system can control the automatic end of these seven processes in turn.


The quality of the injection molded product depends on the manipulation of the technical parameters of the injection molding process, including the input variables of the simulation method, such as the barrel temperature, polymer melt temperature, screw temperature, mold temperature, injection system pressure, screw speed, etc. The digital variable method inputs variables, such as the continuous direction of the screw exit, the front and back direction of the injection seat, the front and back movement of the template, and overtravel, etc. The programmable controller technology was used to transform the injection molding machine system, overcoming the shortcomings of the traditional open-loop control method, and ending the closed-loop control, so that the anti-interference ability and control accuracy of the programmable controller control method were greatly improved compared with the traditional method. It can not only control the switching logic, but also control the analog quantity (such as temperature, pressure, flow, speed, etc.). By closed loop with the help of keyboard and liquid crystal display or digital ladder diagram, the operation process ends. There are three kinds of ladder diagram programming methods: root instruction scheme; step-by-step instruction scheme; shift instruction scheme. Flash, you can set or correct skill process parameters, and have an early warning system and defect flash indicator to monitor the production process, and then greatly advance the function of the entire machine. The transformation cost of PLC control system is low, the construction period is short, the reliability and safety of the system are significantly improved, and it has certain application value.

咨詢

Telephone

Consultation telephone

0755-33855605

Service hotline

13902910763

WeChat

二維碼

Mobile website

Mailbox

Enterprise mailbox

twtaiyou@163.com

主站蜘蛛池模板: 国产欧美日韩高清专区手机版 | 国产午夜精品一二区理论影院 | 久草热视频 | 一级毛片秋霞特色大片 | 色柚视频 | 日韩专区第一页 | 免费观看性欧美毛片 | 久草在线国产视频 | 久久久精品日本一区二区三区 | 中文字幕亚洲综合精品一区 | 久久国产香蕉视频 | 色综合久久88色综合天天 | 久久影视精品 | 一级片看看| 久久精品无遮挡一级毛片 | 中文字幕日韩视频 | 亚洲天天做日日做天天看2018 | 色综合精品久久久久久久 | 久久狠狠第一麻豆婷婷天天 | 国产福利资源在线 | 欧美成人综合视频 | 精品乱人伦一区二区 | 亚洲欧美另类久久久精品能播放的 | 伊人插| 久久成人精品免费播放 | 夜夜躁狠狠躁日日躁2021 | 日本在线观看一级高清片 | 奇米影视777888 | 99久久999久久久综合精品涩 | 国产欧美一区二区三区视频 | 成年美女| 欧美日韩亚洲在线观看 | 亚洲天天做夜夜做天天欢人人 | 波多野结衣在线一区 | 97看剧网| 乱在线伦视频免费 | 国产成人mv在线观看入口视频 | 日本中文字幕有码 | 女bbbbxxxx毛片视频丶 | 亚洲国产精品国产自在在线 | 亚洲精品色婷婷在线影院麻豆 |